Navigation Use the navigation tree to interact with the components.


Conveyor Installation

Detail on the Conveyor Installation



Operation CV Lift (m) CV Line Length (m) Delta (Sag %) Description Starting Time (s)
5 550 3
5 10 3
5.5 60 3
18.3 298.5 2
0.5 90.5 2
95.596 751.744 3
3.5 1140 3
0 30 3
0 92.67 2
13.657 500.703 1.5
5 1000 2
5 1250 3
5.8 1561 3 M34 30
-6.703 593 3 M34 Diagonal 30
2.2 1191 3 M35 30
-3.4 385 3 MB03 30
.2 588 3 MB02 30
3.1 770 3 MB01 30
15.32324 6253.01840 3 Elders 45
12.4003 50.000 2 Radial Stacker 4
8.688 1501.71 2 CVY 4011 30
14.207 1200 2 CVY 4012 30
79.31 705.195 2 CVY 4013 30
44.606 724.414 2 CVY 4014 30
0 28 2 CVY 4015 INITIAL 30
5 57 2 CVY 4016 TRUCK 30
9.1 150 2 CVY 4016 ACC 30
15.2 6536 2 CVY 4017 OLR2 30
40 7070.7 2 CVY 4017 OLR3 30
15.2 6536 2 CVY 4017 PRECRUSH 30
0 100 2 CVY 4015 FUTURE 30
Elders 8.688 1501.71 2 CVY 4010 30






Engine Beta 0.9

Introduction

Collaborate

Would you like to list your product or become a local Shiftbulk agent?

Site Details

Sign up to get started!

Sign up its free.

Issues

List your issues with the interface.

More details

Terms | Privacy | Contact

Shiftbulk

Shiftbulk is a collaborative platform for creating detailed design calculations and purchasing schedules for belt conveyor systems

Built with Heavy-lifting and Fraternate