To effectively utilize the Shiftbulk platform, access the navigation tree on the left side of the interface. Click on the different components in the tree to interact with them, view their properties, and make adjustments as needed. This user-friendly menu ensures efficient and seamless management of your conveyor system components.




Project Deliverables by Level - Index

The table below provides a suggested documentation index for the delivery of a bulk material handling project.



Purpose Order Notes Level
A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sect... 2 WORK BREAKDOWN STRUCTURE Detailed,Feasibility,Pre-feasibility
Design criteria are the explicit goals that a project must achieve in order to be successful. In recommendation and feasibility reports, especially, the design and decision criteria determine the document's final recommendation for action. Managers use th... 4 DESIGN CRITERIA REPORTS Conceptual,Detailed,Feasibility,Pre-feasibility
Contain The list of Documents and Drawings. 1 DRAWING AND DOCUMENT REGISTER Conceptual,Detailed,Feasibility,Pre-feasibility
A Functional Design Specification also is known as FDS is a document that describes how a process or a control system will operate. Functional Design Specification does not contain any highly technical detail. Rather, it describes how the proposed system... 3 FUNCTIONAL DESIGN SPECIFICATION Detailed
An engineering report is a type of technical editing that presents a problem, analyzes it, and offers solutions. It involves collecting and compiling data and ideas, conducting testing, and organizing the information you gained into comprehensible results... 5 ENGINEERING REPORT Conceptual,Detailed,Feasibility,Pre-feasibility
A risk register is a document used as a risk management tool and to fulfill regulatory compliance acting as a repository for all risks identified and includes additional information about each risk, e.g., nature of the risk, reference and owner, mitigatio... 6 PROJECT RISK REGISTER Conceptual,Detailed,Feasibility,Pre-feasibility
In project management, a schedule is a listing of a project's milestones, activities, and deliverables. Usually dependencies and resources are defined for each task, then start and finish dates are estimated from the resource allocation, budget, task dura... 8 PROJECT SCHEDULE Conceptual,Detailed,Feasibility,Pre-feasibility
A decision log is a list of all the key decisions made on the project. It includes: A reference for the decision. 7 DESCISION REGISTER Conceptual,Detailed,Feasibility,Pre-feasibility
The project index describe the various documents included in the project pack. 0 PROJECT INDEX Conceptual,Detailed,Feasibility,Pre-feasibility




ShiftBulk

Shiftbulk is a collaborative platform that simplifies the design and purchasing process for belt conveyor systems. With a comprehensive database of conveyor components, users can create custom systems and optimize costs and suppliers. Beta 0.9.01

Built with the Fraternate user framework

Collections
Tools
Documentation
Sign up to get started!

Sign up

Site Details
Issues

Shiftbulk not only offers conveyor system management solutions, but also provides a dedicated platform for handling comment queries and issues related to your plant's conveyors. Experience seamless communication and swift issue resolution, leading to improved operational efficiency and optimized performance.

T & C's
Collaborate

If you are interested in collaborating on an activity or project, we welcome you to reach out to us.

© 2023 ShiftBulk