Create your project here. This is used for further reporting refinement.
Title | Client | Project | Internal Job No. | |
---|---|---|---|---|
Bonus Conveyor - Conveyor Culvert Crossing | Kriel Colliery | Conveyor Culvert Crossing | ITH3587 | |
K5313 - Kolomela Mine Southern Stacking Facilities | Kumba Iron Ore | Southern Stacking Facilities Refurbishment | ITH3641 | |
Sishen Mine - Materials Handling Scope Study | Kumba Iron Ore | N/A | ITH3770 | |
M34 M35 Conveyor Design | Kriel Colliery | 1000011286 | ITH3805 | |
CRD - MSC - Drive Systems | Venetia Mine | ITH3861 | ITH3861 | |
Radial Stacker | LSL Consulting | LSL 1800 BW Radial Stacker | BD3140 | |
Elders Phase 2 | Coal South Africa | Colliery | ITH3584 | |
Makuutu Scoping Study | NewPro Mining | Makuutu, Rare Earth Elements | BD3144 | |
Sishen Mine Shuttle Car Designs | Sishen Iron Ore Mine | Shuttle Car Design | ITH3496 | |
Generic Heap Leach System | Generic Client | Generic Project | SHIFT-PROJ-100 | |
Venetia Mine - Ground Handling System Review | Venetia Mine | ITH4093 | ITH4093 | |
ITH4124 - Goedehoop Colliery - Conveyor Capacity Study | Goedehoop Colliery | Conveyor Capacity Study CVR02-CVR03-BS2 | ITH4124 |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.