The table below covers a typical deliverable list for the electricals on a bulk material handling project.
Deliverables | |
---|---|
Single Line Diagram | |
Electrical Load List/Motor list | |
Schematic and control diagram | |
Lighting and small power layouts | |
Layout and cable routing diagrams | |
Cable Schedules | |
General Arrangements | |
Transformer Design Data | |
Motor Start Calculations | |
Load flow and fault level Calculations | |
Protection Relay Settings/Calculations | |
Protection Co-ordination Curves | |
Motor Protection and Drive Configuration Settings | |
Factory Test Reports/Equipment Test Certificates | |
DB Workshop Design Drawing | |
Installation Certificate of Compliance | |
DB/Panel Layout | |
Installation certification | |
Electrical Design Report | |
Control philosophy | |
Connection diagrams / Loop Drawings | |
Panel Layouts | |
Piping and instrumentation diagram |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.