The table below covers the typical general electrical notes on a bulk material handling project.
Notes | |
---|---|
ALL ELECTRICAL INSTALLATION SHALL COMPLY WITH THE ELECTRICAL INSTALLATION SPECIFICATION DOCUMENT NUMBER ENG-ECI-ELC-SPC-004 | |
FABRICATOR TO SUPPLY ALL BOLTS, NUTS AND WASHERS NECESSARY FOR ASSEMBLY AND ERECTION | |
CABLE RACKS ARE ONLY TO BE FACTORY DRILLED, NO DRILLING IS ALLOWED ON SITE | |
ALL FIELD EQUIPMENT TO BE EQUIPPED WITH AN ISOLATION AND LOCKOUT POINT |