Navigation Export to Word

Use the navigation tree to interact with the database.



General Notes - Electrical

The table below covers the typical general electrical notes on a bulk material handling project.



Notes
ALL FIELD EQUIPMENT TO BE EQUIPPED WITH AN ISOLATION AND LOCKOUT POINT
ALL ELECTRICAL INSTALLATION SHALL COMPLY WITH THE ELECTRICAL INSTALLATION SPECIFICATION DOCUMENT NUMBER ENG-ECI-ELC-SPC-004
CABLE RACKS ARE ONLY TO BE FACTORY DRILLED, NO DRILLING IS ALLOWED ON SITE
FABRICATOR TO SUPPLY ALL BOLTS, NUTS AND WASHERS NECESSARY FOR ASSEMBLY AND ERECTION




ShiftBulk

Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01

Built with the Fraternate user framework

Collections
Tools
Documentation
Sign up to get started!

Sign up

Site Details
Issues

List of issues on ShiftBulk.

T & C's
Collaborate

Please feel free to contact us if you would like to work jointly on an activity or project.

© 2020 ShiftBulk