Information Required

This table provides a list of contract inclusions under the "information required" section for a bulk material handling project.



Information Required
Limitations on the use and retention of tooling and equipment brought into site.
SCADA data: amp draw on drives, deco (speed sensor) wheel feedback. Ideally scale data to determine actual mass flow on conveyor or design tensions through drive system.
Overall operational availability, in terms of operating hours per year and probable delays due to poor weather, holidays and shift patterns.
Details on possible routing options for the materials handling equipment (including land ownership considerations, road crossing etc.).
Equipment schedules including belt, pulley, drive, idler and take-up information.
Process design criteria ( i.e. material PSD estimates , bulk densities and material contamination in the form of tramp )
Site surveys.
Allocation of drawing numbers for the project.
Conveyor layout.
Photographs of existing installation.
Preferred choice of chute liner material
Site initiation requirements.
Site / Company specific drawing borders.
List of preferred site & fabrication contractor.
Existing Study Documentation.
Rated Nameplates of drive units.
Any previous reports issued on equipment behaviour.




ShiftBulk

Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01

Built with the Fraternate user framework

Collections
Tools
Documentation
Sign up to get started!

Sign up

Site Details
Issues

List of issues on ShiftBulk.

T & C's
Collaborate

Please feel free to contact us if you would like to work jointly on an activity or project.

© 2020 ShiftBulk