The table below covers a typical deliverable list for the Fire Detection and Suppression System on a bulk material handling project.
Deliverables | |
---|---|
Commissioning
|
|
Spray bars with spray nozzles
|
|
Supervision and Labour for installation of equipment.
|
|
Design, supply, Manufacturing and installation of equipment.
|
|
Linear Heat Cabling
|
|
Tanks
|
|
Associated brackets and supports.
|
|
Water storage Tank and fittings.
|
|
Pipes and Supports
|
|
Equipment Connections
|
|
Electrical motors.
|
|
Pumps
|
|
On-board instrumentation and local control panels
|
|
And any other items deemed necessary for operation.
|
|
Valves and Fittings
|
|
Zone Detectors
|
A platform developed to streamline conveyor system design, procurement, and maintenance in mining operations. Beta 1.0.0
Built with the Fraternate user framework
If you are interested in collaborating on an activity or project, we welcome you to reach out to us.