The table below covers a typical deliverable list for the Fire Detection and Suppression System on a bulk material handling project.
Deliverables | |
---|---|
Pipes and Supports
|
|
Electrical motors.
|
|
Spray bars with spray nozzles
|
|
Supervision and Labour for installation of equipment.
|
|
Design, supply, Manufacturing and installation of equipment.
|
|
Equipment Connections
|
|
Commissioning
|
|
Linear Heat Cabling
|
|
Pumps
|
|
Tanks
|
|
Valves and Fittings
|
|
On-board instrumentation and local control panels
|
|
Zone Detectors
|
|
Water storage Tank and fittings.
|
|
Associated brackets and supports.
|
|
And any other items deemed necessary for operation.
|