When a conflict in requirements arises between a specification and other referenced documents, the following order of precedence shall apply. The list below describes the suggested precedence’s for a bulk material handling conveyor project. Should there be any further conflict then the Client or his appointed representative decision shall be final and based on the highest standards available.
Order | Item | |
---|---|---|
1 | Contractual Requirements | |
2 | Project Specifications | |
3 | Engineering drawings | |
4 | Applicable Project Specification | |
5 | Conditions of Contract | |
6 | Project Special Conditions of Contract | |
7 | Other Referenced Specifications |
Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01
Built with the Fraternate user framework
Please feel free to contact us if you would like to work jointly on an activity or project.