List of contract inclusions under the "Assumptions" section for a bulk material handling belt conveyor system project.




Assumptions
Any other process inefficiencies, bottlenecks etc. Process elements will be treated as black boxes.
Changes to the scope and schedule may result in requests for amendment.
Critical contractors appointed by site will be reviewed by the company, and the company reserves the right to recommend changes to these appointments.
Material Characteristics of the chute and loading conditions are to remain unchanged.
Presentations and alignment meetings will be conducted telephonically.
Risk assessment of any site work will be covered by the client's SHEQ system. Safe conditions of work will be provided at all times.
Site to provide all travel within the mine including transportation of hand held instrumentation and tools.
The company reserves the right to control the appointment critical project staff.
Any discrete element modelling simulation will only consider the impact of changes to the transfer tower chutes as per the analysis within the defined battery limits and not any other process parameters.


Open Issues


Navigation
Use the navigation tree to interact with the database.



ShiftBulk

Shiftbulk aims to improve the speed of design, detailing and purchasing of a conveyor system. It aims at reducing the complexity of sourcing equipment, specifying designs, generation and management of equipment lists and generally reducing the complexity of OEM product selection. Beta 0.9.01

Built with the Fraternate user framework

Collections
Tools
Documentation
Sign up to get started!

Sign up its free.

Site Details
Site Map
Issues

List your issues with the interface.

T & C's
Collaborate

Please feel free to contact us if you would like to work jointly on an activity or project.

© 2020 ShiftBulk